Great Ormond Street Hospital
Client Great Ormond Street Hospital NHS Trust
Consultant Ingleton Wood
Value £1.1M

Cosmur has carried out a series of contracts at Great Ormond Street Hospital, varying in size including single ward refurbishments with an approximate value of £450,000, the creation of a new Audiometry room, and the £1.1m refurbishment of the Mental Health Transitional Care Unit.

The contract periods have varied in length from 12 to 26 weeks but most have been carried out to fast track programmes as dictated by the operational requirements of the Hospital. All of the projects were carried out within the existing estate and without disrupting the running of the Hospital.

Some of the ward refurbishments required special dust and vibration suppression measures to be taken due to their close proximity to wards catering for children with respiratory problems, or sensitive research areas.